Puesto Morales / Rinconada
Fig. 1

Fig. 2

Puesto Morales
2008 (To Q/4)- 25 wells, No seismic
- 17 Oil, 4 Inj, 1 Dual Inj & Oil
- 1 Gas, 2 Dry
- 1 oil well, No seismic
Rinconada
2008 (To Q/4)- 2 wells, No seismic
- 1 Oil, 1 Dry
- 1 well (WOC), No seismic
Vaca Mahuida (50% costs)
2008 (To Q/4)- 3 wells, 1,150 Km2 3D seismic
- 1 Oil, 1 Dry, 1 WOC.
- No wells, finished 3D processing
Gob. Ayala II
2008 (To Q/4)- No wells, process 210 Km2 3D
- No wells, No seismic
Puesto Guevara
2008 (To Q/4)- No wells, 100 Km2 3D seismic
- No wells, finished 3D processing
Puesto Morales Este
2008 (To Q/4)- 2 wells, No seismic
- 1 Oil, 1 Gas
- No wells, No seismic
- Established production at Puesto Morales/ Rinconada blocks with prolific Sierras Blancas discoveries
- Lower risk exploration/exploitation
- Attractive fiscal terms despite price controls
- Acquired 100% from Connacher in late 2004 for shares and a note
- Production averaged +/- 300 boe/d in 2004 and has been increased to approximately 7,700 boe/d currently (Q3 2008)
- Infrastructure in place
- Shallow drilling depths
- Multiple pay zones
- Upside as never systematically explored
- Continued infill and exploratory drilling
Puesto Morales/Rinconada, Argentina
- 95,000 acres
- Block contains Puesto Morales and Rinconada oil and natural gas fields
- Extensive 3D seismic program completed in 2005, 2006, 2007, 2008
- Waterflood underway
- Treatment plant completed
- Crude oil sales pipeline and natural gas sales pipeline completed
- Independent reserves assessed at 17.8 million boe proved (1P), 25.6 million boe proved plus probable (2P) and 39.0 million boe prored plus probable plus possible (3P)
Fig. 3: Puesto Morales Stratigraphy
Fig. 4: Puesto Morales Pipelines and Discovery Wells
Fig. 5: Initial Discovery Well
Fig. 6: Puesto Morales Oil Facilities

Fig. 7: Puesto Morales – Current Waterflood Projects

- Injection in SB/PR in North and Center Pools
- Injection pilot in LM9 in North Pool
- Injection pilot in LM10 in PMS field
- 17 total injectors
- Water injection rate reached facility capacity of 25,000 bw/d
- Current production from waterflooding, 783 bo/d
Fig. 8: Puesto Morales – Incremental Waterflood Production Forecast

Fig. 9: Puesto Morales – LM Development

Puesto Morales Norte (LM9)
- Primary Recovery Factor ~ 10 to 15%
Puesto Morales Sur(LM10)
- Production flat at 80bopd over the last 30 years
- 2007 Oil Reserve P1 @ 0.29 MMbo
- Current Recovery Factor of 8-10%
General
- Two waterflood pilot projects implemented (one in north for LM9, one in south for LM10)
- With an increased recovery factor through the implementation of a waterflood and a reduction of well costs – aggressive development becomes attractive